QZ
Qiao Zhang
Sustainability Director at Winning Consortium Simandou
View Qiao's Contact Info for Free. Sign Up and Get 50 Free Contacts Per Month.Get Started for Free
Work Experience
Sustainability Director
Jul 2022 - Present · 2 years and 6 months
Apr 2016 - Jul 2022 · 6 years and 3 months
Environmental And Safety Advisor
Aug 2017 - Jul 2022 · 4 years and 11 months
Safety Advisor (System And Culture)
Apr 2016 - Jul 2017 · 1 years and 3 months
Company Details
501-1000 Employees
Winning Consortium Simandou (“WCS”) plans on commencing an iron ore mine in the Kankan Region, Kérouané Prefecture of Guinea, Africa. The Simandou area (Figure 1) is split into four mineable blocks, Block #1, #2, #3 and #4, of which Block #1 and Block#2 (Figure 2) are owned by WCS and is where the Simandou Project is located. WCS owns 100% of the Concession extending the entirety of Blocks #1 and #2. The Project is currently in the design, engineering and impact assessment phase, with preparation of the bulk of on-site construction planned for 2022. WCS won the public tender to develop Simandou Iron Ore Blocks #1 and #2 on 12 November 2019 and signed a Base Convention agreement with the Guinean Government on 9 June 2020, which was approved by the Guinean National Assembly on 26 June 2020. Winning Consortium Simandou Railway (hereinafter referred to as “WCSR”) and WCS signed a Rail Infrastructure Agreement for Simandou Iron Ore #1 and #2 with the Guinean Government on 12 November 2020, which was approved by the Guinean National Assembly on 23 November 2020. The same process applied for the Winning Consortium Simandou Port (hereinafter referred to as “WCSP”) and WCS, signing on the same day of 12 November 2020 and also being approved on 23 November 2020. Amongst iron ore deposits worldwide, the overall Simandou deposits constitute the largest unexploited reserve of high-quality iron ore. The blocks #1 and #2, to be developed by WCS, currently accounts for more than 1.8 billion tonnes of estimated reserves, with an iron content of more than 65.5wt%.
Year Founded
1994
Social Media
LinkedinFacebookTwitter
Industry
Mining
HQ Location
Camayenne Corniche Nord (Derrière Camp Boiro), BP 4357, Commune de dixinn, Conakry, République de Guinée Conakry, 4357, GN
Keywords
--
Discover More About Cleveland Clinic

Find verified contacts of Qiao Zhang in seconds from 700M people profiles. Start now!

No Credit Card Needed. By signing up, you understand and agree to Futern's Terms and Policy.