Established in 1997, VAM is an independent solution provider in :
- Offshore Oil & Gas processing skids
- Biogas upgrading (Evonik membranes)
- Cogeneration (combined heat & power) plant (Jenbacher gas engines)
- Water treatment
To serve you better, VAM has in-house engineering and fabrication capabilities located at 20 min. from Tan Son Nhat international airport, Ho Chi Minh City.
With an average head count of 120, our multidiscipline engineering department of 40 engineers (process, structural, piping, electrical, instrumentation, QA/QC, project coordination) is able to design and fabricate any processing equipment based your specificatons :
- Combined heat and power plant (Jenbacher engines)
- Containerized biogas upgrading unit (3-stage process)
- Fuel gas conditioning skid
- Gas engine-driven seawater injection pump (Waukesha, BHGE)
- Nitrogen generation package (membranes)
- Gas-fired and electric crude oil heaters
- Containerized offshore gas engine generator
- Glycol gas dehydration and regeneration package
- etc.
Lots of packages has been designed and built in Vietnam for the first time by VAM.
Our skid design are third-party certified by ABS or DNV-GL.
If you need to optimize your OPEX and CAPEX without compromising safety and reliability, you should contact us at info@vam.vn.