Punj Lloyd-Limak-Kalyon Joint Venture is formed to execute Lot 4 of the Trans-Anatolian Natural Gas Pipeline (TANAP) Project, which encompasses the 459 Km 48" route from Eskişehir to the Greek border, excluding the offshore zone of Çanakkale Strait. TANAP, passing through Turkey, will be a central part of Southern Gas Corridor, which will connect the Shah Deniz gas field in Azerbaijan to Europe through the South Caucasus Pipeline (SCP), TANAP and the Trans Adriatic Pipeline (TAP).