JN
Jagadish Nln
Senior Mechanical Engineer at Alysj Jv
View Jagadish's Contact Info for Free. Sign Up and Get 50 Free Contacts Per Month.Get Started for Free
Work Experience
Senior Mechanical Engineer
Apr 2016 - Present · 8 years and 8 months
Fire Protection Engineer
Jul 2006 - Present · 18 years and 5 months
Company Details
10000+ Employees
ALYSJ Joint Venture, which is led by AKTOR and includes L&T, Yapi Merkezi,STFA and Al Jaber Engineering’s participation. A consortium led by Greek construction major Ellaktor has been awarded a USD 4.4 bn contract for the design and construction of the Doha Metro Gold Line. The project is expected to be completed by August 2018. Ellaktor subsidiary Aktor, which has a 32 percent stake in the Alysj joint venture, has signed the contract for the project, which is expected to take 54 months to complete, an Ellaktor statement said. The Gold Line is by far the largest single construction package of the Doha Metro. It traverses Doha from East to West. Doha metro routes The Gold Line will connect the airport’s northern part with Souq Waqif, Msheireb, Bin Mahmoud, Al Sadd and Al Waab. The project includes 32-km of bore tunnelling with a diameter of six metres, tunnelling lined with approximately 128,000 segments, six tunnel boring machines (TBMs) utilised simultaneously, 13 underground stations fitted out with high-end finishes and state of the art mechanical, engineering and plumbing (MEP) systems, 2.5 million cubic metres of excavations for the stations and one million cubic metres of concreting. The project also includes traffic and utilities diversions
Year Founded
2014
Social Media
Linkedin
Industry
Truck Transportation
HQ Location
Al Waab Street Ar Rayyān, Al Rayyan, QA
Keywords
--
Discover More About Cleveland Clinic

Find verified contacts of Jagadish Nln in seconds from 700M people profiles. Start now!

No Credit Card Needed. By signing up, you understand and agree to Futern's Terms and Policy.