DG
Domenico Garofalo
Specialista Ingegneria Di Manutenzione Strumentale at Isab S.R.L.
View Domenico's Contact Info for Free. Sign Up and Get 50 Free Contacts Per Month.Get Started for Free
Work Experience
Specialista Ingegneria Di Manutenzione Strumentale
Apr 2005 - Present · 19 years and 8 months
Analista It
Apr 2004 - Apr 2005 · 1 years
Consulente It
Jan 2004 - Apr 2004 · 3 months
Company Details
1001-5000 Employees
ISAB's refining, gasification and electricity cogeneration plants, included in the petrochemical of Priolo Gargallo (located in Sicily, between Catania and Syracuse), represent one of the largest industrial sites in Europe, both in terms of size and in terms of complexity, and consist of three production sites called "SOUTH Plants", "NORTH Plants" and "IGCC Plant" (Integrated Gasification Combined Cycle), interconnected each other through a system of pipelines. The processing capacity of the refining plants is 320 thousand barrels per day, while the storage capacity is 4 million cubic meters of products and raw materials. The I.G.C.C. plant generates electric energy by means of a power station with a capacity of 532 MW, which uses as fuel the gas produced from the gasification of the TAR. The gasification plant allows to use one million tons/year of TAR generated by refinery plants, transforming it into synthesis gas, from which are extracted sulfur and other components. The gas, so purified, is then sent to a system of combined cycle turbines for the production of electricity and steam. The plant produces about 4 TWh/year of electric energy, representing 2% of the Italian national production. Today, the Refinery is in continuous evolution, with the construction of new facilities, improving the efficiency of existing ones, and this has made it possible to meet the challenges of the market, improving the quality of products and also decreasing the emission of pollutants into the atmosphere. As evidence of the above, the Refinery has obtained the certificates issued by independent third parties in accordance with the following international standards: ISO 14001:2004 for our Environmental Management System; BS OHSAS 18001:2007 for our Occupational Health and Safety Management System; ISO 50001:2011 for our Energy Management System; ISO 9001:2015 for our supply by sea and storage of raw materials, blending and storage of finished products, products loading and shipping by sea and laboratory activities. Today over 1,000 people are operating on these sites.
Year Founded
2008
Social Media
Linkedin
Industry
Oil and Gas
HQ Location
Ex Strada Statale 114, Km. 146 Priolo Gargallo, Siracusa 96010, IT
Keywords
Oil Refining
Discover More About Cleveland Clinic

Find verified contacts of Domenico Garofalo in seconds from 700M people profiles. Start now!

No Credit Card Needed. By signing up, you understand and agree to Futern's Terms and Policy.