Unique Meghnaghat Power Limited (UMPL), a 584 MW(net) gas fired combined cycle power plant is under construction in the Meghnaghat region situated in Sonargaon of Narayanganj district of Bangladesh.
The Project will operate on natural gas/Re-gasified Liquefied Natural Gas (RLNG) and will be based on the combined-cycle technology. The Project will comprise GE’s latest H-Class Gas Turbine (GT), GE 9HA.01 model, a Heat Recovery Steam Generator (HRSG) and a Steam Turbine (ST). The total area of the project will be 18.75 acres and the overall estimated cost of the project is approximately 520 million USD.