Planning
Elaboration of studies.
General design of process instrumentation and control systems,
Detailed design of process instrumentation and control systems,
As built plans after building of process instrumentation and control systems
Construction and building
Assembly of central control cabinets of process control systems.
Installation of central and field process control devices.
Commissioning of central and field process control devices.
Design, test and putting into operation
Configuration of process control programs (both basic control (PLC) and supervisory control (SCADA)
Quality assurance
Tests before and after installation.
Installation qualification.
Operational qualification.
Software qualification.
Gap analysis – conformity analysis of validation requirements (risk analysis, GaMP and 21 CFR Part11), Development
Solution of unique process control problems
Development of special software solutions
Simulation and modelling in the field of process control systems
Explosionproof practice